Irrigation Engineering For diversion of flood water of rivers, the type of canal constructed, is Ridge canal Canal Inundation canal Perennial canal Ridge canal Canal Inundation canal Perennial canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The amount of irrigation water required to meet the evapotranspiration needs of the crop during its full growth is called effective rainfall consumptive irrigation requirement net irrigation requirement consumptive use effective rainfall consumptive irrigation requirement net irrigation requirement consumptive use ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If 6.0 cm 4.5 cm 4 cm 5 cm 6.0 cm 4.5 cm 4 cm 5 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hydroelectric scheme operating under a head of 80 m will be classified as None of these high head scheme low head scheme medium head scheme None of these high head scheme low head scheme medium head scheme ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For a standing crop, the consumptive use of water is equal to the depth of water Transpired by the crop Evaporated by the crop Used by the crop in transpiration, evaporation and also the quantity of water evaporated from adjacent soil Transpired and evaporated by the crop Transpired by the crop Evaporated by the crop Used by the crop in transpiration, evaporation and also the quantity of water evaporated from adjacent soil Transpired and evaporated by the crop ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The normal annual precipitation at stations X, A, B and C are 700 mm, 1000 mm, 900 mm and 800 mm respectively. If the storm precipitation at three station A, B and C were 100 mm, 90 mm and 80 mm respectively, then the storm precipitation for station X will be 70mm 90 mm 80mm 105 mm 70mm 90 mm 80mm 105 mm ANSWER DOWNLOAD EXAMIANS APP