Irrigation Engineering Which of the following canal outlets maintains a constant discharge ? non-modular outlet flexible outlet None of these rigid module non-modular outlet flexible outlet None of these rigid module ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Boulders stage of the river Trough stage of the river Rock stage of the river Delta stage of the river Boulders stage of the river Trough stage of the river Rock stage of the river Delta stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is 100 PLC PL/1000C PC/100L PLC/1000 100 PLC PL/1000C PC/100L PLC/1000 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Generally the weir is aligned at right angles to the direction of the main river current because It ensures less length of the weir All of these It gives better discharging capacity It is economical It ensures less length of the weir All of these It gives better discharging capacity It is economical ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 20 m3/sec 35 m3/sec 25 m3/sec 30 m3/sec 20 m3/sec 35 m3/sec 25 m3/sec 30 m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A multipurpose reservoir is the one which is both (A) and (B) planned and constructed to serve various purposes designed for one purpose but serves more than one purpose None of these both (A) and (B) planned and constructed to serve various purposes designed for one purpose but serves more than one purpose None of these ANSWER DOWNLOAD EXAMIANS APP