Environmental Engineering The process of lagooning is primarily a means of Reducing the excessive flow in sewers Disposing of sludge Increasing the capacity of storage reservoirs Increasing flow of sewage through imhoff tanks Reducing the excessive flow in sewers Disposing of sludge Increasing the capacity of storage reservoirs Increasing flow of sewage through imhoff tanks ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering When there is no recirculation of sewage, then recirculation factor is Infinity 1 None of these Infinity 1 None of these ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering For normal sludge, the value of sludge index for Indian conditions is 150 to 350 350 to 500 50 to 150 0 to 50 150 to 350 350 to 500 50 to 150 0 to 50 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The distribution mains are designed for Maximum daily demand Maximum hourly demand Average daily demand Maximum hourly demand on maximum day Maximum daily demand Maximum hourly demand Average daily demand Maximum hourly demand on maximum day ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Dissolved oxygen in streams is Same throughout the day Minimum at noon Maximum at midnight Maximum at noon Same throughout the day Minimum at noon Maximum at midnight Maximum at noon ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Scour valves are provided At street corners to control the flow of water At the foot of rising main along the slope to prevent back running of water At every depression and dead ends to drain out the waste water that may collect there At every summit of rising mains At street corners to control the flow of water At the foot of rising main along the slope to prevent back running of water At every depression and dead ends to drain out the waste water that may collect there At every summit of rising mains ANSWER DOWNLOAD EXAMIANS APP