Environmental Engineering Standard BOD is measured at 30°C - 5 day 20°C - 5 day 20°C - 1 day 25°C - 3 day 30°C - 5 day 20°C - 5 day 20°C - 1 day 25°C - 3 day ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The main disadvantage of cement concrete sewers is Difficulty in construction Less strength Difficulty in transportation due to heavy weight Less life Difficulty in construction Less strength Difficulty in transportation due to heavy weight Less life ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The suitable layout of a distribution system for irregularly growing town is Ring system Grid iron system Radial system Dead end system Ring system Grid iron system Radial system Dead end system ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Generally the detention period for grit chambers is kept as 5 minutes 12 hours 1 minute 24 hours 5 minutes 12 hours 1 minute 24 hours ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Residual chlorine in water is determined by None of these Both (A) and (B) Orthotolidine method Starch iodide method None of these Both (A) and (B) Orthotolidine method Starch iodide method ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The length of rectangular sedimentation tank should not be more than (Where ‘B’ is the width of the tank) 8B 4B B 2B 8B 4B B 2B ANSWER DOWNLOAD EXAMIANS APP