Environmental Engineering If the average daily consumption of a city is 100,000 m³, the maximum daily consumption on peak hourly demand will be 270000 m³ 100000 m³ 150000 m³ 180000 m³ 270000 m³ 100000 m³ 150000 m³ 180000 m³ ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Generally the detention period for grit chambers is kept as 24 hours 1 minute 12 hours 5 minutes 24 hours 1 minute 12 hours 5 minutes ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If Biochemical oxygen demand (BOD) of a town is 20000 kg/day and BOD per capita per day is 0.05 kg, then population equivalent of town is 4000 1000 1,00,000 4,00,000 4000 1000 1,00,000 4,00,000 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The overflow rate for plain sedimentation tanks is about 1000 to 1250 liters/hour/ m² 500 to 750 liters/hour/ m² 1250 to 1500 liters/hour/m² 1500 to 2000 liters/hour/m² 1000 to 1250 liters/hour/ m² 500 to 750 liters/hour/ m² 1250 to 1500 liters/hour/m² 1500 to 2000 liters/hour/m² ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The amount of residual chlorine left in public water supply for safety against pathogenic bacteria is about 0.01 to 0.05 ppm 0.5 to 1.0 ppm 1.0 to 5.0 ppm 0.05 to 0.5 ppm 0.01 to 0.05 ppm 0.5 to 1.0 ppm 1.0 to 5.0 ppm 0.05 to 0.5 ppm ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering In chlorination, with the rise in temperature of water, death rate of bacteria None of these Increases Decreases Remains unaffected None of these Increases Decreases Remains unaffected ANSWER DOWNLOAD EXAMIANS APP