• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Environmental Engineering

Environmental Engineering
If Biochemical oxygen demand (BOD) of a town is 20000 kg/day and BOD per capita per day is 0.05 kg, then population equivalent of town is

1000
1,00,000
4,00,000
4000

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The detention period in coagulation tanks is usually kept as

2 to 6 days
30 to 45 minutes
2 to 6 hours
1 to 2 minutes

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
Septic tank is a (i) Settling tank (ii) Digestion tank (iii) Aeration tank

Only (i)
Only (iii)
(i) and (ii)
(i) and (iii)

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The detention period for oxidation ponds is usually kept as

24 hours
48 hours
10 to 15 days
3 months

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The process in which the chlorination is done beyond the break point is known as

Post chlorination
Break point chlorination
Pre-chlorination
Super chlorination

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
If the time of concentration is 9 minutes, then the intensity of rainfall according to British Ministry of Health formula will be

40 mm/hr
20 mm/hr
10 mm/hr
4 mm/hr

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Environmental Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑