GETCO Exam Paper (30-11-2008) The planning Commission was set up in September, 1947 January, 1948 April, 1947 March,1950 September, 1947 January, 1948 April, 1947 March,1950 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is 2 3 4 6 2 3 4 6 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Transmission efficiency increases as voltage decreases but power factor increases voltage and power factor both decrease voltage and power factor both increase voltage increases but power factor decreases voltage decreases but power factor increases voltage and power factor both decrease voltage and power factor both increase voltage increases but power factor decreases ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The C.B.s which produces the least arc energy are plain oil minimum oil air blast air break plain oil minimum oil air blast air break ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The function of a breather in a transformer is to arrest flow of moisture into the tank to provide protection against over currents to suppress harmonics to control the level of oil in the tank to arrest flow of moisture into the tank to provide protection against over currents to suppress harmonics to control the level of oil in the tank ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Function of breather is to extract moisture from air going into the conservator.it is small container filled with silica gel.silica gel in breather will be blue colour when installedsilica gel turn into pink colour when absorb moisture.
GETCO Exam Paper (30-11-2008) If the folt current is 2000 A, the relay setting is 50 percent & CT ratio is 400/5, the plug setting multiplier is 50 25 10 15 50 25 10 15 ANSWER DOWNLOAD EXAMIANS APP