GETCO Exam Paper (30-11-2008) The planning Commission was set up in September, 1947 April, 1947 March,1950 January, 1948 September, 1947 April, 1947 March,1950 January, 1948 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Transfer of power between two power systems takes place with power flowing from the system with the Higher input current Greater leading power angle Lagging power angle Higher voltage level Higher input current Greater leading power angle Lagging power angle Higher voltage level ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Isolaters used in transmission lines are capable of breaking fault current load current charging current no current fault current load current charging current no current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The power handling capabilities of transmission lines are controlled by load frequency control equipments set by design factors both (a) & (c ) determined by system operators controlled by load frequency control equipments set by design factors both (a) & (c ) determined by system operators ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The voltage regulation of a transformer at full load and 0.8 power factor lagging is 2.5%. The voltage regulation at full load, 0.8 power factor leading will be zero 0.01 2.5% -2.5% zero 0.01 2.5% -2.5% ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully completeA light breeze _____ the forest fire and made it more dangerous lit extinguished blew fanned lit extinguished blew fanned ANSWER DOWNLOAD EXAMIANS APP