GETCO Exam Paper (30-11-2008) The planning Commission was set up in January, 1948 September, 1947 April, 1947 March,1950 January, 1948 September, 1947 April, 1947 March,1950 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Directional over current relays have two exciting coils connected across _____ secondary's of two _____ phases T., different P.T., different T. & P.T., same T. & P.T., different T., different P.T., different T. & P.T., same T. & P.T., different ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The arc voltage in a C.B. is _____ with the arc current none of these in phase leading by 90˚ lagging by 90˚ none of these in phase leading by 90˚ lagging by 90˚ ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If the +Ve, -Ve & zero sequence reactances of an elements of a power system are 0.3, 0.3 & 0.8 p.u. respectively, the element would be transmission line static load synchronous motor synchronous generator transmission line static load synchronous motor synchronous generator ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully completeThe blood donation camp was organized _____ Naval Youth Club from by to with from by to with ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The power handling capabilities of transmission lines are set by design factors determined by system operators controlled by load frequency control equipments both (a) & (c ) set by design factors determined by system operators controlled by load frequency control equipments both (a) & (c ) ANSWER DOWNLOAD EXAMIANS APP