GETCO Exam Paper (30-11-2008) The planning Commission was set up in January, 1948 March,1950 April, 1947 September, 1947 January, 1948 March,1950 April, 1947 September, 1947 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The power handling capabilities of transmission lines are set by design factors controlled by load frequency control equipments both (a) & (c ) determined by system operators set by design factors controlled by load frequency control equipments both (a) & (c ) determined by system operators ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Which of the following connection of transformer will give the highest secondary voltage? star primary, star secondary star primary, delta secondary Delta primary, star secondary Delta primary, delta secondary star primary, star secondary star primary, delta secondary Delta primary, star secondary Delta primary, delta secondary ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If a combination of HRC fuse and a C.B. is employed, the C.B. operates for this combination is never employed in practice under all abnormal currents short circuit currents low over load currents this combination is never employed in practice under all abnormal currents short circuit currents low over load currents ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If the folt current is 2000 A, the relay setting is 50 percent & CT ratio is 400/5, the plug setting multiplier is 25 15 10 50 25 15 10 50 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If a power system is transiently stable, it is always dynamically stable will oscillate beyond the first swing may be dynamically unstable both (a) & (c ) is always dynamically stable will oscillate beyond the first swing may be dynamically unstable both (a) & (c ) ANSWER DOWNLOAD EXAMIANS APP