GETCO Exam Paper (30-11-2008) In the protection scheme relay functions as _____ device breaking sensing none of these switching breaking sensing none of these switching ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The load carrying capability of a long transmission line is increased at low ambient air temperature both (a) & (b) may be limited by stability considerations is always limited by conductor area is increased at low ambient air temperature both (a) & (b) may be limited by stability considerations is always limited by conductor area ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The first oil refinery in India was set up at Bombay (Mumbai) Vishakhapatnam Barauni Diboi Bombay (Mumbai) Vishakhapatnam Barauni Diboi ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The planning Commission was set up in September, 1947 January, 1948 March,1950 April, 1947 September, 1947 January, 1948 March,1950 April, 1947 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If the folt current is 2000 A, the relay setting is 50 percent & CT ratio is 400/5, the plug setting multiplier is 10 50 15 25 10 50 15 25 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The arc voltage in a C.B. is _____ with the arc current leading by 90˚ lagging by 90˚ none of these in phase leading by 90˚ lagging by 90˚ none of these in phase ANSWER DOWNLOAD EXAMIANS APP