GETCO Exam Paper (30-11-2008) The power handling capabilities of transmission lines are both (a) & (c ) determined by system operators set by design factors controlled by load frequency control equipments both (a) & (c ) determined by system operators set by design factors controlled by load frequency control equipments ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully complete. I have a _____ respect for his scholarship close steady profound strong close steady profound strong ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Interconnected power systems operating with "tie line bias" will respond to frequency changes only tie line voltage changes only both frequency and tie line load changes tie line load changes only frequency changes only tie line voltage changes only both frequency and tie line load changes tie line load changes only ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Choose the word which is most nearly the SAME in meaningSPRING source issue forth means overpower source issue forth means overpower ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The load carrying capability of a long transmission line is always limited by conductor area may be limited by stability considerations both (a) & (b) is increased at low ambient air temperature is always limited by conductor area may be limited by stability considerations both (a) & (b) is increased at low ambient air temperature ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Graded time lag over current relaying without directional features can be employed for protection of radial feeders parallel feeders none of these ring mains radial feeders parallel feeders none of these ring mains ANSWER DOWNLOAD EXAMIANS APP