GETCO Exam Paper (30-11-2008) Transfer of power between two power systems takes place with power flowing from the system with the Higher voltage level Lagging power angle Higher input current Greater leading power angle Higher voltage level Lagging power angle Higher input current Greater leading power angle ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Entrance to the Indian Civil Service was made possible for the Indians by Lord Dalhousie Lord Lytton Lord Ripon Lord Canning Lord Dalhousie Lord Lytton Lord Ripon Lord Canning ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Isolaters used in transmission lines are capable of breaking no current load current charging current fault current no current load current charging current fault current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Transient stability of a power system depends on the short circuit ratio of generating units the strength of transmission network fault-clearing time All of these the short circuit ratio of generating units the strength of transmission network fault-clearing time All of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) On a long high voltage transmission line with heavy load, VAR compensation can be provided by using series inductive reactors shunt inductive reactors shunt capacitors series capacitors series inductive reactors shunt inductive reactors shunt capacitors series capacitors ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Graded time lag over current relaying without directional features can be employed for protection of parallel feeders radial feeders ring mains none of these parallel feeders radial feeders ring mains none of these ANSWER DOWNLOAD EXAMIANS APP