GETCO Exam Paper (30-11-2008) A CB under normal conditions, should be inspected once in 5 years a week 3 or 6 months a month 5 years a week 3 or 6 months a month ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The symmetrical components are used in fault analysis because the number of equations become lesser none of these the sequence networks do not have mutual couplings the result are in terms of symmetrical components the number of equations become lesser none of these the sequence networks do not have mutual couplings the result are in terms of symmetrical components ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Highest voltage for transmitting electrical power in India is (in 2008) 400 kV 700 kV 765 kV 550 kV 400 kV 700 kV 765 kV 550 kV ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The delay fuses are used for protection of motors none of these light circuits fluorescent lamp motors none of these light circuits fluorescent lamp ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully complete. I have a _____ respect for his scholarship close strong profound steady close strong profound steady ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Power system A is operating in parallel with other systems and has a frequency bias of 50 MW/0.1 Hz. For a loss of generation in one of the interconnected systems resulting in a frequency drop of 0.02 Hz, system A should provide 20 MW of support provide 10 MW of support not be affected provide 30 MW support provide 20 MW of support provide 10 MW of support not be affected provide 30 MW support ANSWER DOWNLOAD EXAMIANS APP