GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
A CB under normal conditions, should be inspected once in

5 years
3 or 6 months
a week
a month

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
With the increase in mechanical force applied, the contact resistance

increases
decreases
remains unaltered
is unpredictable

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If the folt current is 2000 A, the relay setting is 50 percent & CT ratio is 400/5, the plug setting multiplier is

10
15
50
25

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Corona usually occurs when the electrostatic stress in the air around the conductor succeeds

6.6 kV (rms value)/cm
11 kV (rms value)/cm
22 kV (maximum value)/cm
30 kV (maximum value)/cm

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The load carrying capability of a long transmission line

may be limited by stability considerations
both (a) & (b)
is always limited by conductor area
is increased at low ambient air temperature

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is

3
2
6
4

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑