GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
In distance protection, the relay measures _____ impedance of the line from relay up to the fault point.

negative sequence
zero sequence
self
positive sequence

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Ashoka sent his son and daughter for the preaching of Buddhism to

Javadvipa
Sumatra
Ceylon
Kambodia

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Corona usually occurs when the electrostatic stress in the air around the conductor succeeds

6.6 kV (rms value)/cm
11 kV (rms value)/cm
30 kV (maximum value)/cm
22 kV (maximum value)/cm

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If the +Ve, -Ve & zero sequence reactances of an elements of a power system are 0.3, 0.3 & 0.8 p.u. respectively, the element would be

synchronous motor
synchronous generator
transmission line
static load

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Directional over current relays have two exciting coils connected across _____ secondary's of two _____ phases

T. & P.T., different
P.T., different
T., different
T. & P.T., same

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
A CB under normal conditions, should be inspected once in

3 or 6 months
a week
a month
5 years

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑