GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
Summation transformers are used in _____ relays.

earth-fault
carrier
pilot-wire
distance

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The power handling capabilities of transmission lines are

both (a) & (c )
controlled by load frequency control equipments
determined by system operators
set by design factors

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If the folt current is 2000 A, the relay setting is 50 percent & CT ratio is 400/5, the plug setting multiplier is

50
10
15
25

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Which of the following inernational body is associated / collaborating in the National 'Population Education Programme' in the country?

UNESCO
WHO
IMF
UNFPA

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If the +Ve, -Ve & zero sequence reactances of an elements of a power system are 0.3, 0.3 & 0.8 p.u. respectively, the element would be

synchronous motor
transmission line
static load
synchronous generator

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Which of the following regulation is considered to be the best

0.02
0.3
0.7
0.98

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑