GETCO Exam Paper (30-11-2008) Summation transformers are used in _____ relays. pilot-wire earth-fault carrier distance pilot-wire earth-fault carrier distance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Power system A is operating in parallel with other systems and has a frequency bias of 50 MW/0.1 Hz. For a loss of generation in one of the interconnected systems resulting in a frequency drop of 0.02 Hz, system A should provide 10 MW of support not be affected provide 30 MW support provide 20 MW of support provide 10 MW of support not be affected provide 30 MW support provide 20 MW of support ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If a combination of HRC fuse and a C.B. is employed, the C.B. operates for under all abnormal currents low over load currents short circuit currents this combination is never employed in practice under all abnormal currents low over load currents short circuit currents this combination is never employed in practice ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Isolaters used in transmission lines are capable of breaking fault current no current charging current load current fault current no current charging current load current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully completeA light breeze _____ the forest fire and made it more dangerous extinguished fanned blew lit extinguished fanned blew lit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In the parallel operation of transformers, which statement is false transformers voltage ratings same transformers transformation ratios same None of these transformers kVA ratings equal transformers voltage ratings same transformers transformation ratios same None of these transformers kVA ratings equal ANSWER DOWNLOAD EXAMIANS APP