GETCO Exam Paper (30-11-2008) If a combination of HRC fuse and a C.B. is employed, the C.B. operates for short circuit currents this combination is never employed in practice low over load currents under all abnormal currents short circuit currents this combination is never employed in practice low over load currents under all abnormal currents ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The planning Commission was set up in January, 1948 March,1950 September, 1947 April, 1947 January, 1948 March,1950 September, 1947 April, 1947 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In an over current protection, the setting of earth fault relay is _____ the phase fault relay. not related in equal to more than less than not related in equal to more than less than ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) An AC transmission line requires a VAR input: to improve stability to reduce losses to increase power transmission to improve the regulation to improve stability to reduce losses to increase power transmission to improve the regulation ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Supreme Command of all the three wings of the armed forces is vested in the Chief of Army Staff Defence Minister Prime Minister of India President of India Chief of Army Staff Defence Minister Prime Minister of India President of India ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) When transformers or switchgears are to be installed in a transmission line, the poles used are H type J type L type I type H type J type L type I type ANSWER DOWNLOAD EXAMIANS APP