GETCO Exam Paper (30-11-2008) If a combination of HRC fuse and a C.B. is employed, the C.B. operates for low over load currents under all abnormal currents short circuit currents this combination is never employed in practice low over load currents under all abnormal currents short circuit currents this combination is never employed in practice ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The voltage regulation of a transformer at full load and 0.8 power factor lagging is 2.5%. The voltage regulation at full load, 0.8 power factor leading will be zero -2.5% 2.5% 0.01 zero -2.5% 2.5% 0.01 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) On a long high voltage transmission line with heavy load, VAR compensation can be provided by using series inductive reactors shunt inductive reactors series capacitors shunt capacitors series inductive reactors shunt inductive reactors series capacitors shunt capacitors ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In 1567 at the Battle of Haldighati Akbar defeated Pratap Singh Amar Singh Man Singh Uday Singh Pratap Singh Amar Singh Man Singh Uday Singh ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Isolaters used in transmission lines are capable of breaking no current charging current load current fault current no current charging current load current fault current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In a dry type transformer, accumulation of dust on the windings and core is likely to cause short circuiting of secondary winding short circuiting of primary winding corrosion of core material reduction in heat dissipation short circuiting of secondary winding short circuiting of primary winding corrosion of core material reduction in heat dissipation ANSWER DOWNLOAD EXAMIANS APP