GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
Bulk-oil CBs can be used for voltage upto

1.1 kV
66 kV
33 kV
11 kV

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If the folt current is 2000 A, the relay setting is 50 percent & CT ratio is 400/5, the plug setting multiplier is

10
50
25
15

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
On a long high voltage transmission line with heavy load, VAR compensation can be provided by using

series inductive reactors
shunt inductive reactors
series capacitors
shunt capacitors

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If the fault occurs near the relay, the V/I ratio will be _____ that of if the fault occurs away from the relay.

equal to
lower than
none of these
higher than

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
In distance protection, the relay measures _____ impedance of the line from relay up to the fault point.

self
zero sequence
negative sequence
positive sequence

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If the +Ve, -Ve & zero sequence reactances of an elements of a power system are 0.3, 0.3 & 0.8 p.u. respectively, the element would be

static load
synchronous motor
synchronous generator
transmission line

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑