GETCO Exam Paper (30-11-2008) If a power system is transiently stable, it may be dynamically unstable both (a) & (c ) will oscillate beyond the first swing is always dynamically stable may be dynamically unstable both (a) & (c ) will oscillate beyond the first swing is always dynamically stable ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Rewirable fuse has _____ time-current characteristic square none of these inverse linear square none of these inverse linear ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The arc voltage in a C.B. is _____ with the arc current in phase leading by 90˚ none of these lagging by 90˚ in phase leading by 90˚ none of these lagging by 90˚ ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) A CB under normal conditions, should be inspected once in a month 3 or 6 months a week 5 years a month 3 or 6 months a week 5 years ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) When a star delta transformer bank of three single phase transformers is to be used for step down transformation with line voltages of 23000 V and 2300 V, the ratio of transformation will be 5.8:1 12.1:1 17.2:1 10.0:1 5.8:1 12.1:1 17.2:1 10.0:1 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If a combination of HRC fuse and a C.B. is employed, the C.B. operates for under all abnormal currents this combination is never employed in practice low over load currents short circuit currents under all abnormal currents this combination is never employed in practice low over load currents short circuit currents ANSWER DOWNLOAD EXAMIANS APP