GETCO Exam Paper (30-11-2008) If the folt current is 2000 A, the relay setting is 50 percent & CT ratio is 400/5, the plug setting multiplier is 10 15 50 25 10 15 50 25 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Transfer of power between two power systems takes place with power flowing from the system with the Greater leading power angle Higher input current Higher voltage level Lagging power angle Greater leading power angle Higher input current Higher voltage level Lagging power angle ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) A CB under normal conditions, should be inspected once in 3 or 6 months a week 5 years a month 3 or 6 months a week 5 years a month ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Transient stability of a power system depends on the strength of transmission network All of these fault-clearing time the short circuit ratio of generating units the strength of transmission network All of these fault-clearing time the short circuit ratio of generating units ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) An AC transmission line requires a VAR input: to improve stability to increase power transmission to reduce losses to improve the regulation to improve stability to increase power transmission to reduce losses to improve the regulation ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In an overhead transmission line, wave traps are used for the detection of the _____ signals. fault voltage fault current carrier fault power fault voltage fault current carrier fault power ANSWER DOWNLOAD EXAMIANS APP