GETCO Exam Paper (30-11-2008) The Non-co-operation movement was launched by Mahatma Gandhi in 1920 1905 1926 1921 1920 1905 1926 1921 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The power handling capabilities of transmission lines are both (a) & (c ) set by design factors determined by system operators controlled by load frequency control equipments both (a) & (c ) set by design factors determined by system operators controlled by load frequency control equipments ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Burden of the relay is _____ rating of relay current voltage watt volt-amp. current voltage watt volt-amp. ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully complete You have _____ trouble to all of us. done resulted produced caused done resulted produced caused ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The power transmitted will be maximum when sending end voltage is more reactance is high receiving end voltage is more corona losses are least sending end voltage is more reactance is high receiving end voltage is more corona losses are least ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) An AC transmission line requires a VAR input: to improve the regulation to increase power transmission to improve stability to reduce losses to improve the regulation to increase power transmission to improve stability to reduce losses ANSWER DOWNLOAD EXAMIANS APP