GETCO Exam Paper (30-11-2008) On a long high voltage transmission line with heavy load, VAR compensation can be provided by using series inductive reactors shunt inductive reactors series capacitors shunt capacitors series inductive reactors shunt inductive reactors series capacitors shunt capacitors ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) An air blast C.B. is usually employed for _____ duty intermittent repeated instantaneous short intermittent repeated instantaneous short ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The planning Commission was set up in April, 1947 March,1950 January, 1948 September, 1947 April, 1947 March,1950 January, 1948 September, 1947 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Which of the following regulation is considered to be the best 0.98 0.3 0.7 0.02 0.98 0.3 0.7 0.02 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In the parallel operation of transformers, which statement is false transformers voltage ratings same transformers kVA ratings equal transformers transformation ratios same None of these transformers voltage ratings same transformers kVA ratings equal transformers transformation ratios same None of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) When a star delta transformer bank of three single phase transformers is to be used for step down transformation with line voltages of 23000 V and 2300 V, the ratio of transformation will be 10.0:1 17.2:1 12.1:1 5.8:1 10.0:1 17.2:1 12.1:1 5.8:1 ANSWER DOWNLOAD EXAMIANS APP