Process Equipment and Plant Design The minimum plate spacing in most of the pertroleum refinery distillation columns (of dia > 3 ft) is normally __________ inches. 34 6 12 18 34 6 12 18 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The buckling tendency of compression members is always in the direction of the None of these Least radius of gyration Axis of the load Perpendicular to the axis of the load None of these Least radius of gyration Axis of the load Perpendicular to the axis of the load ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In packed absorption tower, onset of flooding usually occurs at a pressure drop of about __________ mm of water column per metre height of packing. 50-75 750-1000 25-50 200-250 50-75 750-1000 25-50 200-250 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In the design of a shell and tube heat exchanger, the corrosion allowance All of these Need not be provided for non-pressure parts like tie rods, spacers, baffles, supports etc For carbon steel and cast iron pressure parts is 1.5 mm (except for tubes) and for severe conditions it is 3 mm For internal cover and tube sheet is provided on both the sides All of these Need not be provided for non-pressure parts like tie rods, spacers, baffles, supports etc For carbon steel and cast iron pressure parts is 1.5 mm (except for tubes) and for severe conditions it is 3 mm For internal cover and tube sheet is provided on both the sides ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Oxygen carrying pipelines in chemical industries are coloured with __________ colour. Red Yellow Blue Black Red Yellow Blue Black ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Le/D for fully open globe value may be around 25 75 300 10 25 75 300 10 ANSWER DOWNLOAD EXAMIANS APP