Irrigation Engineering The measure to remove water logging of land, is Neither (a) nor (b) To reduce percolation from canals and water courses To increase outflow from the ground water reservoir Both (a) and (b) Neither (a) nor (b) To reduce percolation from canals and water courses To increase outflow from the ground water reservoir Both (a) and (b) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Boulders stage of the river Rock stage of the river Trough stage of the river Delta stage of the river Boulders stage of the river Rock stage of the river Trough stage of the river Delta stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a Sarda type fall, the rectangular crest, may be used for discharge up to 14 cumecs 6 cumecs 10 cumecs 20 cumecs 14 cumecs 6 cumecs 10 cumecs 20 cumecs ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The length of a meander is the distance along the river between the tangent point of one curve to the tangent point of Reverse curve Next curve of the same order None of these Reverse curve plus the width of the river Reverse curve Next curve of the same order None of these Reverse curve plus the width of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The shape of recession limb of a hydrograph depends upon None of these Basin characteristics only Storm characteristics only Both (A) and (B) None of these Basin characteristics only Storm characteristics only Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a concrete canal the approximate permissible velocity of water should not exceed 0.5 m/sec 1.5 m/sec 2 m/sec 1 m/sec 0.5 m/sec 1.5 m/sec 2 m/sec 1 m/sec ANSWER DOWNLOAD EXAMIANS APP