Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Free board Height of bank Berm None of these Free board Height of bank Berm None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Bed bars in a canal are provided To raise the supply level To watch the general behavior of canal To measure the discharge To control the silting To raise the supply level To watch the general behavior of canal To measure the discharge To control the silting ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be 972 hectares/m3/sec 837 hectares/m3/sec 637 hectares/m3/sec 1172 hectares/m3/sec 972 hectares/m3/sec 837 hectares/m3/sec 637 hectares/m3/sec 1172 hectares/m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The net head under which the turbine reaches its peak efficiency at synchronous speed is called design head operating head gross head rated head design head operating head gross head rated head ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Left side All listed here Both sides Right side Left side All listed here Both sides Right side ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in level crossing aqueduct and super passage super passage and canal syphon aqueduct and syphon aqueduct level crossing aqueduct and super passage super passage and canal syphon aqueduct and syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP