Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Berm None of these Height of bank Free board Berm None of these Height of bank Free board ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The discharge passing over an ogee spillway is given by (where, L is effective length of spillway crest and H is the total head over the spillway crest including velocity head.) CHL3/2 CLH3/2 CLH1/2 CLH5/2 CHL3/2 CLH3/2 CLH1/2 CLH5/2 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Hydrograph is the graphical representation of surface runoff and time ground waterflow and time runoff and time rainfall and time surface runoff and time ground waterflow and time runoff and time rainfall and time ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Irrigation water having the concentration of Na++ , Ca++ and Mg++ as 20, 3 and 1 Milli equivalent per litre respectively will be classified as high sodium water low sodium water medium sodium water very high sodium water high sodium water low sodium water medium sodium water very high sodium water ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A current meter is used to measure the velocity of flow of water discharge depth of flow of water None of these velocity of flow of water discharge depth of flow of water None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable section of a lined canal, is None of these Triangular section with circular bottom for small canals Trapezoidal section with rounded corners for large canals Both (a) and (b) None of these Triangular section with circular bottom for small canals Trapezoidal section with rounded corners for large canals Both (a) and (b) ANSWER DOWNLOAD EXAMIANS APP