Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Free board Height of bank Berm None of these Free board Height of bank Berm None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a chute spillway, the flow is usually critical subcritical uniform super critical critical subcritical uniform super critical ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Effective precipitation for a crop may be defined as Total precipitation minus the loss due to evaporation Total precipitation minus the loss due to infiltration Total precipitation during the crop period Available water stored in soil within root zone of the crop Total precipitation minus the loss due to evaporation Total precipitation minus the loss due to infiltration Total precipitation during the crop period Available water stored in soil within root zone of the crop ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Hydrodynamic pressure due to earthquake acts at a height of 3H/4π above the base 4H/3π above the base 4H/3π below the water surface, where H is the depth of water 3H/4π below the water surface 3H/4π above the base 4H/3π above the base 4H/3π below the water surface, where H is the depth of water 3H/4π below the water surface ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The minimum size of stone that will remain at rest in a channel of longitudinal slope S and hydraulic mean depth R is given by 4RS 11RS 7RS 15 RS 4RS 11RS 7RS 15 RS ANSWER DOWNLOAD EXAMIANS APP