Irrigation Engineering
The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to

Load factor
Both load and plant factor
Utilization factor
Plant factor

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct statement from the following and answer

In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal
In a level crossing, a cross regulator is provided on the canal below the crossing
All of these
In a level crossing a regulator is provided across the drainage at its down-stream

ANSWER DOWNLOAD EXAMIANS APP