Irrigation Engineering The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to Utilization factor Both load and plant factor Plant factor Load factor Utilization factor Both load and plant factor Plant factor Load factor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A river training work is generally required when the river is Aggrading Meandering Degrading All of these Aggrading Meandering Degrading All of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If Δ is the depth of water in metres, B is the number of days of base period and D is the duty in hectare/cumec, the relationship which holds good, is B = Δ (8.64 B/D) Δ = (8.6 B/D) D = (8.6 Δ/B) D = Δ (8.64 D/B) B = Δ (8.64 B/D) Δ = (8.6 B/D) D = (8.6 Δ/B) D = Δ (8.64 D/B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is 100 PLC PL/1000C PLC/1000 PC/100L 100 PLC PL/1000C PLC/1000 PC/100L ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For a proportional outlet, the flexibility is zero greater than 1 between zero and 1 1 zero greater than 1 between zero and 1 1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the irrigation efficiency is 80%, conveyance losses are 20% and the actual depth of watering is 16 cm, the depth of water required at the canal outlet, is 10 cm 25 cm 20 cm 15 cm 10 cm 25 cm 20 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP