Irrigation Engineering A multipurpose reservoir is the one which is designed for one purpose but serves more than one purpose both (A) and (B) None of these planned and constructed to serve various purposes designed for one purpose but serves more than one purpose both (A) and (B) None of these planned and constructed to serve various purposes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Process of meandering is due to All listed here Discharge and hydraulic properties of streams Relative erodibility of the bed and banks Sediment load of streams All listed here Discharge and hydraulic properties of streams Relative erodibility of the bed and banks Sediment load of streams ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is PC/100L 100 PLC PL/1000C PLC/1000 PC/100L 100 PLC PL/1000C PLC/1000 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In case of a trapezoidal notch fall All listed here Top length of the piers should not be less than their thickness Splay upstream from the notch section is 45° Splay downstream from the notch section is 22½° All listed here Top length of the piers should not be less than their thickness Splay upstream from the notch section is 45° Splay downstream from the notch section is 22½° ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on All listed here Right side Both sides Left side All listed here Right side Both sides Left side ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a chute spillway, the flow is usually critical uniform subcritical super critical critical uniform subcritical super critical ANSWER DOWNLOAD EXAMIANS APP