Process Equipment and Plant Design The LMTD correction factor (FT) is applied in __________ heat exchangers. Double pipe All multipass All of these 1-1 cocurrent Double pipe All multipass All of these 1-1 cocurrent ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A minimum clearance of about __________ mm is maintained between the distillation column wall and the bubble cap. 38 76 19 95 38 76 19 95 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a heat exchanger, shell side fluid velocity can be changed by changing the tube Neither A nor B Both A & B Pitch Layout Neither A nor B Both A & B Pitch Layout ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In case of bubble cap distillation column of diameter greater than 1.2 metres, the cap diameter is roughly about __________ cms. 30 20 10 35 30 20 10 35 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Log mean temperature difference in case of multi-pass shell and tube heat exchanger is always More than arithmetic mean value Both B & C More than geometric mean value Less than arithmetic mean value More than arithmetic mean value Both B & C More than geometric mean value Less than arithmetic mean value ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In seive plate column, holes are drilled or punched in sizes ranging from 2.5 to 12 mm (5 mm being widely used). The hole pitch is normally __________ times the hole diameter to give the required hole area. 2.5 to 4.0 5 to 10 10 to 15 0.5 to 1.5 2.5 to 4.0 5 to 10 10 to 15 0.5 to 1.5 ANSWER DOWNLOAD EXAMIANS APP