Automation System The ideal solution is to have a system coordinator who will interface with the engineering and manufacturing managers, as well as the: MIS manager finance manager president marketing manager None of these MIS manager finance manager president marketing manager None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System When was the first successful industrial robot installed in the General Motors Plant in USA? None of these 1961 1963 1960 1967 None of these 1961 1963 1960 1967 ANSWER DOWNLOAD EXAMIANS APP
Automation System Resolution in a CRT refers to: the number of phosphor dots that react when hit by the electron beam the number of addressable elements on the tube None of these the speed at which the monitor can accept data from the computer the number of pixels in each square centimeter the number of phosphor dots that react when hit by the electron beam the number of addressable elements on the tube None of these the speed at which the monitor can accept data from the computer the number of pixels in each square centimeter ANSWER DOWNLOAD EXAMIANS APP
Automation System A way to transfer programs to a central system is: All of these to copy the program into PROMs and install the PROMs in the system None of these to develop the program on the actual system only by setting bit switches on the central CPU All of these to copy the program into PROMs and install the PROMs in the system None of these to develop the program on the actual system only by setting bit switches on the central CPU ANSWER DOWNLOAD EXAMIANS APP
Automation System What is offset error? the difference between the controller output and the setting of the manipulated variable. All of these None of these the difference between the sensor input and the absolute sensed parameter. the difference between the control setpoint value and the actual value. the difference between the controller output and the setting of the manipulated variable. All of these None of these the difference between the sensor input and the absolute sensed parameter. the difference between the control setpoint value and the actual value. ANSWER DOWNLOAD EXAMIANS APP
Automation System If the transient response is under damped: both a and b the present overshoot is zero None of these the value of the output will exceed the value of the input at times during the transient period steady-state will be reached faster than if the system is overdamped both a and b the present overshoot is zero None of these the value of the output will exceed the value of the input at times during the transient period steady-state will be reached faster than if the system is overdamped ANSWER DOWNLOAD EXAMIANS APP