Waste Water Engineering The density of population over 40 hectares is 250/hectare. If water supply demand per day is 200 litres and sewage discharge is 80% of water supply, the sewage flow in sewers of separate system, is 0.05556 cumec 0.05552 cumec 0.0556 cumec 0.05554 cumec 0.05556 cumec 0.05552 cumec 0.0556 cumec 0.05554 cumec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 160 cm 140 cm 120 cm 100 cm 160 cm 140 cm 120 cm 100 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer pipe contains 1 mm sand particles of specific gravity 2.65 and 5 mm organic particles of specific gravity 1.2, the minimum velocity required for removing the sewerage, is 0.35 m/sec 0.30 m/sec 0.45 m/sec 0.40 m/sec 0.35 m/sec 0.30 m/sec 0.45 m/sec 0.40 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Rate of flow of sewage is generally assumed More than the rate of water supply Less than the rate of water supply Equal to the rate of water supply At 150 litres per capita More than the rate of water supply Less than the rate of water supply Equal to the rate of water supply At 150 litres per capita ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewage, the solids in mg per litre is 500 to 1000 1500 to 2000 100 to 500 1000 to 1500 500 to 1000 1500 to 2000 100 to 500 1000 to 1500 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is 2 hours 5 hours 3 hours 4 hours 2 hours 5 hours 3 hours 4 hours ANSWER DOWNLOAD EXAMIANS APP