Power Systems The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station? 30 MW 50 MW 720 MW 72 MW 30 MW 50 MW 720 MW 72 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Lightning arresters are used for All of these protection of equipment from open circuits protection of equipment from external lightning protection of equipment from short circuits All of these protection of equipment from open circuits protection of equipment from external lightning protection of equipment from short circuits ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 1.3. 0.83. 0.44. 0.25. 1.3. 0.83. 0.44. 0.25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The conductor of a 10 Km long single phase, two wire line are separated by a distance of 1.5 m the diameter of each conductor the inductance of the circuit is 23.33 mH. 25.8 mH. 21.2 mH. 23.8 mH. 23.33 mH. 25.8 mH. 21.2 mH. 23.8 mH. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A string insulator has 4 units. The voltage across the bottom most unit is 33.33% of total voltage. Its string efficiency is 75% 25% 33.33% 66.66% 75% 25% 33.33% 66.66% ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Steam turbine. Super heater. Boiler. Condenser. Steam turbine. Super heater. Boiler. Condenser. ANSWER DOWNLOAD EXAMIANS APP