Let a = 13, b = 14 and c = 15. Then, s = 1 2 a + b + c =21 (s- a) = 8, (s - b) = 7 and (s - c) = 6. Area = s s - a s - b s - c = 21 × 8 × 7 × 6 = 84 sq.cm
perimeter = total cost / cost per m = 10080 /20 = 504mside of the square = 504/4 = 126mbreadth of the pavement = 3mside of inner square = 126 - 6 = 120marea of the pavement = (126 x126) - (120 x 120) = 246 x 6 sq mcost of pavement = 246*6*50 = Rs. 73800
let the side of the square be x meterslength of two sides = 2x metersdiagonal = 2 x = 1.414x m saving on 2x meters = .59x m saving % = 0 . 59 x 2 x * 100 % = 30% (approx)
Increase in circumference of circle = 5%? Increase in radius is also 5%.Now, increase in area of circle = 2a + (a2/100) %Where, a = increase in radius= 2 x 5 + (5 x 5)/100 % = 10.25%