GETCO Exam Paper (22-07-2015) Switching surges are high votage DCs high voltage Acs short duration transient voltage power frequency voltage high votage DCs high voltage Acs short duration transient voltage power frequency voltage ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) No load efficiency of tranformer is _____ than full load efficiency lesser greater same depends on load lesser greater same depends on load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 100 150 300 200 100 150 300 200 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Power Factor correcting element is generally connected in _____ parallel to the load series with source parallel to source series with load parallel to the load series with source parallel to source series with load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Jyotigram Yojana is pertaining to Developing agricultural land Supplying 100% reliable power for street light of villages Supplying resedential and other power separately Supplying 100% reliable power to villages Developing agricultural land Supplying 100% reliable power for street light of villages Supplying resedential and other power separately Supplying 100% reliable power to villages ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The recent (as on 22/07/2015) Mahakumbh is held at Ujjain Nasik Haridwar Alahabad Ujjain Nasik Haridwar Alahabad ANSWER DOWNLOAD EXAMIANS APP