Power Systems Surge impedance loading of a 3-phase, 400 kV transmission line is 400 Ω. The surge impedance loading is 800 MW 1600 MW 200 MW 400 MW 800 MW 1600 MW 200 MW 400 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the total installed power capacity (MW) in West Bengal as published by ministry of power in 2011? 10000.32. 6114.05. 8113.27. 15515.22. 10000.32. 6114.05. 8113.27. 15515.22. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is Pelton. Kaplan. Francis. Impeller. Pelton. Kaplan. Francis. Impeller. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If, for a given alternator in economic operation mode, the incremental cost is given by (0.012 P + 8) Rs/MWh, dPL/dP = 0.2 and plant λ = 25, then power generation is 750 MW 1500 MW 1250 MW 1000 MW 750 MW 1500 MW 1250 MW 1000 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transformer is used in sub station for operating a protective relay? capacitor voltage transformer distribution transformer All of these auto transformer capacitor voltage transformer distribution transformer All of these auto transformer ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two identical synchronous machines having same inertia constant are connected in parallel and swinging together. The effective inertia constant is 4 MJ/MVA. Then each machine has inertia constant of 8 MJ/MVA 2 MJ/MVA 4 MJ/MVA 16 MJ/MVA 8 MJ/MVA 2 MJ/MVA 4 MJ/MVA 16 MJ/MVA ANSWER DOWNLOAD EXAMIANS APP