Stage efficiency for packed tower varies with the

All of these
Type & size of packing
Operating pressure and column diameter
Fluid rates and fluid properties

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
A certain pressure vessel manufacturer avoids doing reinforcements calculations for openings by always providing a reinforcing pad extending upto double the diameter of the opening and of the same material and thickness as that of the shell wall. If area compensation is accepted as a code guideline, his approach leads to safe design

Only if the opening is on a vertical cylinderical vessel
Only if the opening is on a horizontal cylinderical vessel
Irrespective of the shape of the vessel
Only if the opening is on spherical vessel

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Pick out the wrong statement about the design of a sieve plate column.

Minimum recommended downcomer residence time for the disengagement of entrained vapour is the same for both foaming and non-foaming liquids, which is about 20 seconds
An increased weir height improves the tray efficiency at the cost of high plate pressure drop; optimum wear height being 40-90 mm for column pressure above atmospheric and 6-12 mm for vacuum columns
For segmental downcomers, the chord length is 60-80% of the column diameter. An initial value of downcomer area of 12% is taken in the design
Width of the calming section provided at the inlet and outlet sides of the plate is 75 mm for column diameter below 1.5 metres and 100 mm for larger diameter columns