Waste Water Engineering Skimming tanks are Improved version of grit chambers Those from which sludge is skimmed out Used to remove the grease and oil Tanks provided with self- cleansing screens Improved version of grit chambers Those from which sludge is skimmed out Used to remove the grease and oil Tanks provided with self- cleansing screens ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The standard B.O.D. of water is taken for 2 days 5 days 1 day 3 days 2 days 5 days 1 day 3 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer pipe contains 1 mm sand particles of specific gravity 2.65 and 5 mm organic particles of specific gravity 1.2, the minimum velocity required for removing the sewerage, is 0.35 m/sec 0.30 m/sec 0.40 m/sec 0.45 m/sec 0.35 m/sec 0.30 m/sec 0.40 m/sec 0.45 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Floating materials are removed by screening Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here Floating materials are removed by screening Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ¾th or ¼th extra space is left in sewer pipes at maximum discharge for Low estimates of the average and maximum flows Large scale infiltration of storm water All listed here Unexpected increase in population Low estimates of the average and maximum flows Large scale infiltration of storm water All listed here Unexpected increase in population ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 7 m 5 m 5.5 m 6.5 m 7 m 5 m 5.5 m 6.5 m ANSWER DOWNLOAD EXAMIANS APP