GETCO Exam Paper (22-07-2015) Select the wrong statement from the following in relation to power flow analysis No of ittretion in N R method can not be more than 30 for any system Approximation is used in FDLF method jacobian is always required Y Bus is required for power flow analysis No of ittretion in N R method can not be more than 30 for any system Approximation is used in FDLF method jacobian is always required Y Bus is required for power flow analysis ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The fault occurring in transmission actually are mostly L-L-G L-G L-L-L L-L L-L-G L-G L-L-L L-L ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Two heaters rated at 500 W, 250 V each are conneted in series across a 250 V, 50 Hz mains. The total power drawn from the supply would be _____ watt. 250 125 1000 500 250 125 1000 500 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a DC motor, back EMF value becomes maximum at _____ 3/4 load full load 1/2 load no load 3/4 load full load 1/2 load no load ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Answer in official key is “1/2 load ”.
GETCO Exam Paper (22-07-2015) In case of a balanced three phase sinusoidal AC supply, because of the phase difference rotating magnetic field is produced neutral wire is not required, if load is balanced all are correct neutral current is high if load is not balanced rotating magnetic field is produced neutral wire is not required, if load is balanced all are correct neutral current is high if load is not balanced ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? none of these Base load Peak load solar power plant none of these Base load Peak load solar power plant ANSWER DOWNLOAD EXAMIANS APP