Industrial Engineering and Production Management Product layout is employed for All of these Batch production Effective utilization of machine Continuous production All of these Batch production Effective utilization of machine Continuous production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In CPM, the cost slope is determined by Normal Cost/Crash cost (Normal cost - Crash cost)/ (Normal time - Crash time) (Crash Cost - Normal cost)/ (Normal time - Crash time) Crash cost/Normal Cost Normal Cost/Crash cost (Normal cost - Crash cost)/ (Normal time - Crash time) (Crash Cost - Normal cost)/ (Normal time - Crash time) Crash cost/Normal Cost ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work sampling observations are taken on the basis of Past experience Convenience Detailed calculations Table of random numbers Past experience Convenience Detailed calculations Table of random numbers ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be 2 HA 1.15 HA 1.5 HA 1.33 HA 2 HA 1.15 HA 1.5 HA 1.33 HA ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used when Idle time is to be reduced Material handling is to be done Team of workers is working at a place All of these Idle time is to be reduced Material handling is to be done Team of workers is working at a place All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following is independent of sales forecast? Productivity Inventory control Production control Production planning Productivity Inventory control Production control Production planning ANSWER DOWNLOAD EXAMIANS APP