Industrial Engineering and Production Management Product layout is employed for All of these Continuous production Effective utilization of machine Batch production All of these Continuous production Effective utilization of machine Batch production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study is concerned with Improving present method and finding standard time Motivation of workers Improving production planning and control Improving production capability Improving present method and finding standard time Motivation of workers Improving production planning and control Improving production capability ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The disadvantage of product layout is Production time is longer, requiring more goods in inventory High cost of inspection High initial investment for the specialized facilities Skilled labour to operate machines Production time is longer, requiring more goods in inventory High cost of inspection High initial investment for the specialized facilities Skilled labour to operate machines ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Graphical method, simplex method, and transportation method are concerned with Break-even analysis Linear programming Value analysis Queueing theory Break-even analysis Linear programming Value analysis Queueing theory ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Dummy activities are used to None of these Determine the project completion time Maintain the required net work Determine the critical path None of these Determine the project completion time Maintain the required net work Determine the critical path ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The important file in making a PERT is No activity from any event can be started from preceding event till it is completed All of the these An event can't be accomplished until activities leading to it are completed Length of arrow has nothing to do with time No activity from any event can be started from preceding event till it is completed All of the these An event can't be accomplished until activities leading to it are completed Length of arrow has nothing to do with time ANSWER DOWNLOAD EXAMIANS APP