Industrial Engineering and Production Management Product layout is employed for Batch production Continuous production All of these Effective utilization of machine Batch production Continuous production All of these Effective utilization of machine ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT is the Time oriented technique Event oriented technique Activity oriented technique Target oriented technique Time oriented technique Event oriented technique Activity oriented technique Target oriented technique ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The determination of standard time in a complex job system is best done through Analysis of standard data system Grouping timing technique Stop watch time study Analysis of micro-motions Analysis of standard data system Grouping timing technique Stop watch time study Analysis of micro-motions ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management For handling materials during manufacture of cement, a _________ is widely used. Belt conveyor Fork lift truck Bucket conveyor Overhead crane Belt conveyor Fork lift truck Bucket conveyor Overhead crane ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PMTP (predetermined motion time systems) include BNTS (basic motion time study) MTM (method time measurement) All of these WFS (work factor systems) BNTS (basic motion time study) MTM (method time measurement) All of these WFS (work factor systems) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management One time measurement unit (TMU) in method time measurement system equals 0.006 minute 0.0006 minute 0.001 minute 0.0001 minute 0.006 minute 0.0006 minute 0.001 minute 0.0001 minute ANSWER DOWNLOAD EXAMIANS APP