Industrial Engineering and Production Management Product layout is employed for All of these Effective utilization of machine Batch production Continuous production All of these Effective utilization of machine Batch production Continuous production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Product layout is best suited where Product is manufactured in large quantities One type of product is produced All of these Product is standardized Product is manufactured in large quantities One type of product is produced All of these Product is standardized ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The important file in making a PERT is No activity from any event can be started from preceding event till it is completed All of the these An event can't be accomplished until activities leading to it are completed Length of arrow has nothing to do with time No activity from any event can be started from preceding event till it is completed All of the these An event can't be accomplished until activities leading to it are completed Length of arrow has nothing to do with time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time as compared to normal time is There is no such correlation Equal Smaller Greater There is no such correlation Equal Smaller Greater ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Father of time study was R.M. Barnes F.B. Gilbert H.L. Gantt F.W. Taylor R.M. Barnes F.B. Gilbert H.L. Gantt F.W. Taylor ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by AP/C √(2AP/C) 2AP/C (AP/C)² AP/C √(2AP/C) 2AP/C (AP/C)² ANSWER DOWNLOAD EXAMIANS APP