Process Control and Instrumentation Out of the following temperature measuring instruments, the measurement accuracy will be minimum for the Iron-constantan thermocouple Mercury in glass thermometer Optical pyrometer Alcohol filled thermometer Iron-constantan thermocouple Mercury in glass thermometer Optical pyrometer Alcohol filled thermometer ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Time constant is the Same as dead time Time taken by the controlled variable to reach 63.2% of its full change Same as transportation lag Time required by the measured variable to reach 63.2% of its ultimate change Same as dead time Time taken by the controlled variable to reach 63.2% of its full change Same as transportation lag Time required by the measured variable to reach 63.2% of its ultimate change ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation In a shell and tube heat exchanger, the flow rate of heating/cooling fluid is the __________ variable. Manipulated None of these Controlled Load Manipulated None of these Controlled Load ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Number of poles in a system with transfer function 1/(s² + 2s² + 1) is 1 5 2 3 1 5 2 3 ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation The open loop transfer function of a control system is KR/(1 + TS) . This represents Dead time system A first order system A second order system A first order time lag Dead time system A first order system A second order system A first order time lag ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation To increase the speed of response of a pressure spring liquid or gas expansion thermometer, the clearance space between the thermometer bulb and the thermal well should not be filled with Oil A metal powder or graphite Air Mercury Oil A metal powder or graphite Air Mercury ANSWER DOWNLOAD EXAMIANS APP