Environmental Engineering Most suitable section of sewer in separate sewage system is Rectangular section Modified egg shaped section Circular section Standard form of egg shaped sewer Rectangular section Modified egg shaped section Circular section Standard form of egg shaped sewer ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The suitable system of sanitation for area of distributed rainfall throughout the year with less intensity is Partially combined system Separate system Partially separate system Combined system Partially combined system Separate system Partially separate system Combined system ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the average daily consumption of a city is 100,000 m³, the maximum daily consumption on peak hourly demand will be 150000 m³ 100000 m³ 180000 m³ 270000 m³ 150000 m³ 100000 m³ 180000 m³ 270000 m³ ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering For satisfactory working of a sludge digestion unit, the pH range of digested sludge should be maintained as 4.5 to 6.0 6.5 to 8.0 10.5 to 12.0 8.5 to 10.0 4.5 to 6.0 6.5 to 8.0 10.5 to 12.0 8.5 to 10.0 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The main disadvantage of oxidation pond is that Large area is required for construction BOD removal is very low Maintenance and operation cost are high None of these Large area is required for construction BOD removal is very low Maintenance and operation cost are high None of these ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The working conditions in imhoff tanks are Anaerobic only Aerobic only Aerobic in lower compartment and anaerobic in upper compartment anaerobic in lower compartment and aerobic in upper compartment Anaerobic only Aerobic only Aerobic in lower compartment and anaerobic in upper compartment anaerobic in lower compartment and aerobic in upper compartment ANSWER DOWNLOAD EXAMIANS APP