Environmental Engineering The process in which the chlorination is done beyond the break point is known as Break point chlorination Post chlorination Super chlorination Pre-chlorination Break point chlorination Post chlorination Super chlorination Pre-chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering An egg shaped section of sewer Provides self cleansing velocity at low discharges Is easy to construct Is economical than circular section Is more stable than circular section Provides self cleansing velocity at low discharges Is easy to construct Is economical than circular section Is more stable than circular section ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the total hardness of water is greater than its total alkalinity, the carbonate hardness will be equal to Total hardness total alkalinity Total alkalinity Non carbonate hardness Total hardness Total hardness total alkalinity Total alkalinity Non carbonate hardness Total hardness ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The suitable method of forecasting population for a young and rapidly increasing city is Graphical method Incremental increase method Arithmetical increase method Geometrical increase method Graphical method Incremental increase method Arithmetical increase method Geometrical increase method ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The suitable system of sanitation for area of distributed rainfall throughout the year with less intensity is Separate system Combined system Partially separate system Partially combined system Separate system Combined system Partially separate system Partially combined system ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The disinfection efficiency of chlorine increases by (i) Decreasing the time of contact (ii) Decreasing the temperature of water (iii) Increasing the temperature of water Only (i) Only (iii) Both (i) and (iii) Both (i) and (ii) Only (i) Only (iii) Both (i) and (iii) Both (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP