Environmental Engineering The process in which the chlorination is done beyond the break point is known as Break point chlorination Post chlorination Super chlorination Pre-chlorination Break point chlorination Post chlorination Super chlorination Pre-chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Standard BOD is measured at 20°C - 1 day 25°C - 3 day 20°C - 5 day 30°C - 5 day 20°C - 1 day 25°C - 3 day 20°C - 5 day 30°C - 5 day ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The maximum efficiency of BOD removal is achieved in Oxidation ditch Aerated lagoons Trickling filters Oxidation pond Oxidation ditch Aerated lagoons Trickling filters Oxidation pond ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering A pipe conveying sewage from plumbing system of a single building to common sewer or point of immediate disposal is called Sub-main sewer Main sewer Lateral sewer House sewer Sub-main sewer Main sewer Lateral sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Which of the following sewers is preferred for combined system of sewage? Egg shaped sewer Rectangular sewer Circular sewer None of these Egg shaped sewer Rectangular sewer Circular sewer None of these ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering As compared to rapid sand filters, slow sand filters give (i) Slower filtration rate (ii) Higher filtration rate (iii) Lesser efficiency in removal of bacteria (iv) Higher efficiency in removal of bacteria The correct answer is (i) and (iv) (i) and (ii) (ii) and (iii) (ii) and (iv) (i) and (iv) (i) and (ii) (ii) and (iii) (ii) and (iv) ANSWER DOWNLOAD EXAMIANS APP