The process in which the chlorination is done beyond the break point is known as

Break point chlorination
Pre-chlorination
Post chlorination
Super chlorination

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
Scour valves are provided

At every summit of rising mains
At every depression and dead ends to drain out the waste water that may collect there
At the foot of rising main along the slope to prevent back running of water
At street corners to control the flow of water