Environmental Engineering Septic tank is a (i) Settling tank (ii) Digestion tank (iii) Aeration tank Only (i) (i) and (ii) Only (iii) (i) and (iii) Only (i) (i) and (ii) Only (iii) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering In facultative stabilization pond, the sewage is treated by Sedimentation Dual action of aerobic bacteria and anaerobic bacteria Algae only Aerobic bacteria only Sedimentation Dual action of aerobic bacteria and anaerobic bacteria Algae only Aerobic bacteria only ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period for oxidation ponds is usually kept as 3 months 24 hours 10 to 15 days 48 hours 3 months 24 hours 10 to 15 days 48 hours ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The design discharge for the combined sewer system shall be taken as Rainfall + 6 DWF Rainfall + 2 DWF Rainfall + DWF Equal to rainfall Rainfall + 6 DWF Rainfall + 2 DWF Rainfall + DWF Equal to rainfall ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If Biochemical oxygen demand (BOD) of a town is 20000 kg/day and BOD per capita per day is 0.05 kg, then population equivalent of town is 4,00,000 1,00,000 1000 4000 4,00,000 1,00,000 1000 4000 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Air binding phenomena in rapid sand filters occur due to Higher turbidity in the effluent Mud ball formation Low temperature Excessive negative head Higher turbidity in the effluent Mud ball formation Low temperature Excessive negative head ANSWER DOWNLOAD EXAMIANS APP