Process Equipment and Plant Design Low pressure steam (with saturation temperature between 105 to 120°C) is usually used in the vacuum evaporators, which normally employ a vacuum of about __________ mm Hg (referred to a 760 mm mercury barometer). 250 750 450 650 250 750 450 650 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Overall mass transfer co-efficient in case of absorption of __________ in water is based on the gas film co-efficient only, as the mass transfer process is gas film (phase) controlling. None of these NH₃ SO₂ CO₂ None of these NH₃ SO₂ CO₂ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement about the design of seive plate column and the bubble cap column. Weir length for a bubble cap plate is the same as that for the seive plate Weir height in case of a bubble cap plate ranges from 50 to 150 mm and is higher than the seive plate The downcomer design and the residence time in the downcomer is almost same for seive plate and bubble cap columns Weir height for a bubble cap plate column is the same as that for a seive plate column Weir length for a bubble cap plate is the same as that for the seive plate Weir height in case of a bubble cap plate ranges from 50 to 150 mm and is higher than the seive plate The downcomer design and the residence time in the downcomer is almost same for seive plate and bubble cap columns Weir height for a bubble cap plate column is the same as that for a seive plate column ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Shortest distance between two tubes is More in case of triangular pitch as compared to square pitch of tube layout Called tube pitch None of these Called tube clearance More in case of triangular pitch as compared to square pitch of tube layout Called tube pitch None of these Called tube clearance ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A certain pressure vessel manufacturer avoids doing reinforcements calculations for openings by always providing a reinforcing pad extending upto double the diameter of the opening and of the same material and thickness as that of the shell wall. If area compensation is accepted as a code guideline, his approach leads to safe design Irrespective of the shape of the vessel Only if the opening is on a vertical cylinderical vessel Only if the opening is on spherical vessel Only if the opening is on a horizontal cylinderical vessel Irrespective of the shape of the vessel Only if the opening is on a vertical cylinderical vessel Only if the opening is on spherical vessel Only if the opening is on a horizontal cylinderical vessel ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A claming section before the liquid flows into the downcomer is privided to Ensure better vapour-liquid contact Permit release of entrained vapour in the liquid Cool the liquid before it flows down Reduce the discharge fluctuation Ensure better vapour-liquid contact Permit release of entrained vapour in the liquid Cool the liquid before it flows down Reduce the discharge fluctuation ANSWER DOWNLOAD EXAMIANS APP