Length of short transmission line is up to

 40 km
 80 km
 150 km
 any of the above

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The power generated by two plants are; P1 = 50 MW, P2 = 40 MW. If the loss coefficients are B11 = 0.001, B22 = 0.0025 and B12 = -0.0005, then power loss will be

 4.5 MW
 8.5 MW
 5.5 MW
 6.5 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which cooling is preferred for large turbine generator

  Oxygen cooling.
  None of these.
  Hydrogen cooling.
  Nitrogen cooling.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The power output from an hydroelectric plants depend on

 type of turbine, type of dam and type of catchment area.
 type of dam, type of catchment area and discharge.
  discharge, system efficiency.
 type of dam, head, system efficiency.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If we increase the spacing between the phase conductors, the line capacitance

 remains unaffected
 decreases
 increases
None of these

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If power P available from a hydroelectric plant is given by the formula P = 9.81QH, where Q is the flow rate through the turbine in l / s and H is the head in meters, then P will be unit of

 kWh.
 kJ / S.
  W.
 HP.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑