Industrial Engineering and Production Management Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it Consumes time, but no resources Consumes resources but no time Is a dangling event Consumes neither time nor resources Consumes time, but no resources Consumes resources but no time Is a dangling event Consumes neither time nor resources ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management M.T.M. is used to All of these Establish time standards Develop effective methods in advance of the beginning of production Improve existing methods All of these Establish time standards Develop effective methods in advance of the beginning of production Improve existing methods ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known Complete details of items in, waiting line are known Arrival and waiting times are known and can be grouped to form a waiting line model All variables and constants are known and form a linear equation The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known Complete details of items in, waiting line are known Arrival and waiting times are known and can be grouped to form a waiting line model All variables and constants are known and form a linear equation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main objective of work measurement is to Formulate a proper incentive scheme Estimate the selling prices and delivery dates Plan and schedule of production All of these Formulate a proper incentive scheme Estimate the selling prices and delivery dates Plan and schedule of production All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following equations is not in conformity with others? Organization performance × motivation = profits Ability × motivation = performance Knowledge × skill = ability Attitude × situation = motivation Organization performance × motivation = profits Ability × motivation = performance Knowledge × skill = ability Attitude × situation = motivation ANSWER DOWNLOAD EXAMIANS APP