Industrial Engineering and Production Management In the Halsey system of wage incentive plan, a worker is Never a loser Paid as per efficiency Not paid any bonus till his efficiency Ensured of minimum wages Never a loser Paid as per efficiency Not paid any bonus till his efficiency Ensured of minimum wages ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In A-B-C analysis, which class of items are generally large in number? None of these B A C None of these B A C ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT requires Double time estimate None of the listed here Single time estimate Triple time estimate Double time estimate None of the listed here Single time estimate Triple time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Merit rating is the method of determining the Worth of a machine Relative values of a job Workers performance on a job Value of overall production Worth of a machine Relative values of a job Workers performance on a job Value of overall production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM > DAM CAM = DAM CAM < DAM There is no such criterion CAM > DAM CAM = DAM CAM < DAM There is no such criterion ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is negative All of these The activity is critical and any delay in its performance will delay the completion of whole project It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed All of these The activity is critical and any delay in its performance will delay the completion of whole project It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed ANSWER DOWNLOAD EXAMIANS APP