GETCO Exam Paper (22-07-2015) In sub stations for making and breaking of load current load interrupter switches are used relays are used circuit breakers are used isolators are used load interrupter switches are used relays are used circuit breakers are used isolators are used ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) I am looking _____ my pen. Have you seen it? for after to at for after to at ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? high positive correcting torque High gain in a system high retarding torque presence of dead time delay high positive correcting torque High gain in a system high retarding torque presence of dead time delay ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the wrong statement in terms of slack bus? it should be the largest generator bus in the system it has finite reactive power generation capability it should be located at the centre of the area voltage and angle is specified at this bus it should be the largest generator bus in the system it has finite reactive power generation capability it should be located at the centre of the area voltage and angle is specified at this bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For a given transformer volte/turn for primary and secondary winding is different depends on load depends on transformer design same different depends on load depends on transformer design same ANSWER EXPLANATION DOWNLOAD EXAMIANS APP emf = 4.44*f*φ*Temf/T = 4.44*f*φ
GETCO Exam Paper (22-07-2015) In a thermal power plant, heat from the flue gases is recovered in Electric precipitator chimney Economizer condenser Electric precipitator chimney Economizer condenser ANSWER DOWNLOAD EXAMIANS APP