GETCO Exam Paper (22-07-2015) In sub stations for making and breaking of load current load interrupter switches are used circuit breakers are used relays are used isolators are used load interrupter switches are used circuit breakers are used relays are used isolators are used ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Hopkinson's test is the test to be carried out on two identical induction motors two identical DC motors induction motor with synchronous motor induction motor with any DC motor two identical induction motors two identical DC motors induction motor with synchronous motor induction motor with any DC motor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP In hopkinson test known as regenerative testtwo identical machine coupledD.C shunt motorD.C shunt generatortemperature rise can be check under rated conditionlarge machine can be tested without drawing much power.
GETCO Exam Paper (22-07-2015) Power Factor correcting element is generally connected in _____ parallel to source series with source parallel to the load series with load parallel to source series with source parallel to the load series with load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are all are correct Spinning reserve Minimum up time Minimum down time all are correct Spinning reserve Minimum up time Minimum down time ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fast excitation system of the generator will _____ Improve the reactive power control Improve the power factor Improve the voltage control Improve the dynamic stability Improve the reactive power control Improve the power factor Improve the voltage control Improve the dynamic stability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Two watt meter method for 3 phase circuit is preferred over other methods because all are correct PF of the load can also be estimated it can be used for balanced or unbalanced load it can be used for star or delta connected load all are correct PF of the load can also be estimated it can be used for balanced or unbalanced load it can be used for star or delta connected load ANSWER DOWNLOAD EXAMIANS APP