Waste Water Engineering In septic tanks, decomposition of organic bacteria, is done by Aerobic bacteria Both types of bacterias Anaerobic bacteria None of these Aerobic bacteria Both types of bacterias Anaerobic bacteria None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is 212 cu.m 204 cu.m 216 cu.m 208 cu.m 212 cu.m 204 cu.m 216 cu.m 208 cu.m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel from top surface to bottom sludge zone A particle to travel along its length None of these The flow of sewage to fill the tank A particle to travel from top surface to bottom sludge zone A particle to travel along its length None of these The flow of sewage to fill the tank ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sludge tank, the gas mainly produced, is Carbon dioxide Hydrogen Nitrogen Oxygen Carbon dioxide Hydrogen Nitrogen Oxygen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called A heap Windrow Plateau None of these A heap Windrow Plateau None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if None of these A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level A sewer drops from a height None of these A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level A sewer drops from a height ANSWER DOWNLOAD EXAMIANS APP