Power Systems In hydro power stations what is an enlarged body of water just above the intake and used as a regulating reservoir called Fore bay. Reservoir. Penstock. Spillways. Fore bay. Reservoir. Penstock. Spillways. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems When is the ferranti effect on long overhead lines experienced? The line is lightly loaded The line is fully loaded The power factor is unity The line is heavily loaded The line is lightly loaded The line is fully loaded The power factor is unity The line is heavily loaded ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power plants the size of coal after crushing 300 mm. 40 mm. 200 - 205 mm. 20 - 25 mm. 300 mm. 40 mm. 200 - 205 mm. 20 - 25 mm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Oil CB. SF6 CB. Vacuum CB. Air blast CB. Oil CB. SF6 CB. Vacuum CB. Air blast CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Peak load power plants is/are pumped storage plant diesel plant nuclear plants both 1 and 2 pumped storage plant diesel plant nuclear plants both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP