Power Systems In hydro power stations what is an enlarged body of water just above the intake and used as a regulating reservoir called Spillways. Reservoir. Fore bay. Penstock. Spillways. Reservoir. Fore bay. Penstock. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Gas-turbine. Thermal. Nuclear. Hydro Power Plant Gas-turbine. Thermal. Nuclear. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Galvanised steel is generally used as stray wire. earth wire. structural components. All of these stray wire. earth wire. structural components. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 5. 20. 7. 3. 5. 20. 7. 3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a 3-phase, 400 kV transmission line is 400 Ω. The surge impedance loading is 1600 MW 800 MW 400 MW 200 MW 1600 MW 800 MW 400 MW 200 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following grounding is not practically preferred for protection of equipments? reactance grounding All of these resistance grounding isolated grounding reactance grounding All of these resistance grounding isolated grounding ANSWER DOWNLOAD EXAMIANS APP