Power Systems In Francis turbine runner, the number blades is usually of the order of 6 - 8. 16 - 24. 12 - 14. 3 - 6. 6 - 8. 16 - 24. 12 - 14. 3 - 6. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Hydro Power Plant Nuclear. Thermal. Gas-turbine. Hydro Power Plant Nuclear. Thermal. Gas-turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW? P1 = 80 MW, P2 = 120 MW P1 = 60 MW, P2 = 140 MW P1 = 100 MW, P2 = 100 MW P1 = 120 MW, P2 = 80 MW P1 = 80 MW, P2 = 120 MW P1 = 60 MW, P2 = 140 MW P1 = 100 MW, P2 = 100 MW P1 = 120 MW, P2 = 80 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of power system is/are Cost of electrical energy per KWh is to be minimum Reliable power has to be available Flexible power has to be available. All of these Cost of electrical energy per KWh is to be minimum Reliable power has to be available Flexible power has to be available. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Graphite is use din nuclear plant as a / an moderator. fuel. coolant. electrode. moderator. fuel. coolant. electrode. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pin insulators are used up to 11 kV any voltage level 120 kV 33 kV 11 kV any voltage level 120 kV 33 kV ANSWER DOWNLOAD EXAMIANS APP