• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
In Francis turbine runner, the number blades is usually of the order of

 3 - 6.
  16 - 24.
 6 - 8.
 12 - 14.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Deflectors are provided in

 propeller turbine.
 Francis turbine.
  Pelton wheel.
 Kaplan turbine.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Tarapur nuclear power plant has which type of reactor?

 Boiling water type.
 None of these.
 Pressurized water reactors.
 CANDU type reactors.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Deaerative heating is done to

  remove dissolved gases in water.
 remove dissolved.
 heat the feed water.
 heat the steam.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Objectives of power system is/are

 nether 1 nor 2
 Cost of electrical energy per KWh is to be minimum
 Rated voltage and frequency has to be supplied to the consumers
 both 1 and 2

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following is a reaction turbines

  Pelton turbine and Francis turbine.
  Francis turbine and Kaplan turbine.
  Kaplan and Pelton turbine.
  None of these.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑