Power Systems In Francis turbine runner, the number blades is usually of the order of 12 - 14. 3 - 6. 16 - 24. 6 - 8. 12 - 14. 3 - 6. 16 - 24. 6 - 8. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following frequency control method tie line may be overloaded? All of these flat tie line control parallel frequency flat frequency control All of these flat tie line control parallel frequency flat frequency control ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ideal plant load cfactor is greater than 1 less than 1 0 1 greater than 1 less than 1 0 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW? P1 = 100 MW, P2 = 100 MW P1 = 120 MW, P2 = 80 MW P1 = 60 MW, P2 = 140 MW P1 = 80 MW, P2 = 120 MW P1 = 100 MW, P2 = 100 MW P1 = 120 MW, P2 = 80 MW P1 = 60 MW, P2 = 140 MW P1 = 80 MW, P2 = 120 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive (Z1), negative (Z2) and zero sequence (Z0) impedances of a transmission line follows the relation Z1 = Z2 = Z0 (Z1 = Z2) < Z0 any of the above (Z1 = Z2) > Z0 Z1 = Z2 = Z0 (Z1 = Z2) < Z0 any of the above (Z1 = Z2) > Z0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following contributes to the Rankine cycle efficiency improvement in a thermal power plant Use of steam for heating of boiler feed water. Reheat of steam an intermediate stages. Use of high pressure. All of these Use of steam for heating of boiler feed water. Reheat of steam an intermediate stages. Use of high pressure. All of these ANSWER DOWNLOAD EXAMIANS APP