Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called settling time. damping time. coasting time. stopping time. settling time. damping time. coasting time. stopping time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Example of base load stations are both A and B. gas turbine. hydro. thermal. both A and B. gas turbine. hydro. thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical disruptive voltage is a voltage at which corona is just initiated corona is visible with blue or violet colour nether 1 nor 2 both 1 and 2 corona is just initiated corona is visible with blue or violet colour nether 1 nor 2 both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating time of pumped storage plant is high low very high can't say high low very high can't say ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not a secondary nuclear fuel Pu239. U233. U235. None of above. Pu239. U233. U235. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The annual depreciation of hydro power plant is about 10 - 15 %. 15 - 20 %. 0.5 - 1.5 %. 20 - 25 %. 10 - 15 %. 15 - 20 %. 0.5 - 1.5 %. 20 - 25 %. ANSWER DOWNLOAD EXAMIANS APP