Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called stopping time. damping time. settling time. coasting time. stopping time. damping time. settling time. coasting time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of restricting voltage depends upon the Inductance and capacitance of the system. Inductance of the system. Type of CB. Capacitance of the system. Inductance and capacitance of the system. Inductance of the system. Type of CB. Capacitance of the system. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a pumped storage power plant is operated in conjunction with a steam power plant chances of the tripping of the system decrease load factor of the steam plant is increased All of these the operating cost of the steam plant become optimum chances of the tripping of the system decrease load factor of the steam plant is increased All of these the operating cost of the steam plant become optimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by the diesel power station of same output. less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. less than that required by a gas turbine power plant of same output. less than that required by the diesel power station of same output. less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. less than that required by a gas turbine power plant of same output. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 15 MW 5 MW 20 MW 10 MW 15 MW 5 MW 20 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j1 pu j6 pu j3 pu j9 pu j1 pu j6 pu j3 pu j9 pu ANSWER DOWNLOAD EXAMIANS APP