Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called stopping time. coasting time. settling time. damping time. stopping time. coasting time. settling time. damping time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A CT is connected in ___________________ with the line. both A and B. across. not connected. series. both A and B. across. not connected. series. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 3750 kW 6000 kW 7500 kW 3000 kW 3750 kW 6000 kW 7500 kW 3000 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power plants the size of coal after crushing 200 - 205 mm. 300 mm. 20 - 25 mm. 40 mm. 200 - 205 mm. 300 mm. 20 - 25 mm. 40 mm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power level of nuclear reactor can be increase by ( K = multiplication factor ) lowering the value of K below and keeping at that lowered value. lowering the value of K below 1 but later bringing it back to K = 1. raising the value of K above 1, but later bringing it back to K = 1. raising the value of K above 1 and keeping it at raised value. lowering the value of K below and keeping at that lowered value. lowering the value of K below 1 but later bringing it back to K = 1. raising the value of K above 1, but later bringing it back to K = 1. raising the value of K above 1 and keeping it at raised value. ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for minimum capacity breaker. miniature circuit breaker. molded circuit breaker. maximum capacity breaker. minimum capacity breaker. miniature circuit breaker. molded circuit breaker. maximum capacity breaker. ANSWER DOWNLOAD EXAMIANS APP