Process Equipment and Plant Design In case of bubble cap distillation column of diameter greater than 1.2 metres, the cap diameter is roughly about __________ cms. 35 10 30 20 35 10 30 20 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design High pressure fluid in a shell and tube heat exchanger should preferably be routed through the Shell side for smaller total pressure drop Shell side for large overall heat transfer co-efficient Tubes to avoid the expansion of high pressure shell construction Shell side, if the flow is counter-current and tube side if the flow is co-current Shell side for smaller total pressure drop Shell side for large overall heat transfer co-efficient Tubes to avoid the expansion of high pressure shell construction Shell side, if the flow is counter-current and tube side if the flow is co-current ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Normal screwed fittings are used for pipes upto a diameter of __________ inches. 7 3 1.5 5 7 3 1.5 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For a given design of bubble cap, the number of bubble caps to be used per tray is set by the All of these Plate spacing Allowable gas velocity through the slots Diameter of the column All of these Plate spacing Allowable gas velocity through the slots Diameter of the column ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following types of reactors is the safest from operation point of view? A vapor phase reactor Pot type reactor A liquid phase reactor A liquid phase catalytic reactor A vapor phase reactor Pot type reactor A liquid phase reactor A liquid phase catalytic reactor ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The practical representative values of HETP for a number of commercial operations lies within a range of __________ metre. 0.1-0.2 1.2-1.5 0.2-0.5 0.4-0.9 0.1-0.2 1.2-1.5 0.2-0.5 0.4-0.9 ANSWER DOWNLOAD EXAMIANS APP