SSC JE Electrical 2019 with solution SET-1
 In a single-phase capacitor start-and-run motor, the minimum number of capacitors to be used in it is:

4
1
2
3

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

SSC JE Electrical 2019 with solution SET-1
_______is a tube that brings water to turbines

Penstock
Forebay
Spillway
Trash rack

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

SSC JE Electrical 2019 with solution SET-1
The annual load factor of a generation station is equal to

(No. of units actually supplied per month) ⁄ (Max. possible demand × 8760)
(No. of units actually supplied per year) ⁄ (Max. possible demand)
(No. of units actually supplied per year) ⁄ (Max. possible demand × 8760)
(No. of units actually supplied per year) ⁄ (Max. possible demand)

ANSWER DOWNLOAD EXAMIANS APP